What is Critical path?
The path with the largest delay in a circuit, which sets the maximum clock frequency. In STA it is the path with the smallest slack, and speeding up a design starts by reducing its delay.
Japanese name: クリティカルパス
Critical path appears in 2 practice questions across 2 topics, including Logic circuits, Timing analysis and CDC.
Field: Timing analysis and CDC