LSI design flow and EDA
What is it called to reflect small fixes found late in design or during manufacturing by partially modifying the existing layout, without redoing the whole design?
- ATape-out
- BFloorplan
- CECO (engineering change order)
Show answer and explanation
Answer: C. ECO (engineering change order)
An ECO reflects fixes such as small logic bugs or timing adjustments through local changes without redoing all of place and route. If spare cells are placed in advance, some fixes can be made by changing only the metal-layer masks, saving time and cost.
- A. Tape-out is handing off manufacturing data.
- B. Floorplanning decides the rough placement.
- C. Correct. Fixes are reflected through local changes.