LSI design flow and EDA
In the final check before tape-out (sign-off), which power-network analysis is performed alongside timing verification?
- AChecking the package color
- BIR drop and electromigration analysis
- CEstimating the chip price
Show answer and explanation
Answer: B. IR drop and electromigration analysis
Sign-off includes, in addition to timing and DRC/LVS, analysis of voltage drop in the power network (IR drop) and electromigration due to current density in wires. Because a lower supply voltage worsens timing, the two are sometimes analyzed together.