Yield and quality control
Which correctly describes the difference between the control limits of a control chart and a product's specification limits?
- AControl limits are set from the process's actual variation, while specification limits are set from the requirements placed on the product
- BControl limits and specification limits always have the same values
- CControl limits are set by the customer, while specification limits are calculated from process data
Show answer and explanation
Answer: A. Control limits are set from the process's actual variation, while specification limits are set from the requirements placed on the product
Control limits are lines calculated from the mean and variation of data when the process is stable, used to judge whether an abnormality has occurred in the process. Specification limits define the range allowed for the product, set from customer requirements and design. They are based on different ideas, so it is important not to confuse them.