Yield and quality control
In a control chart, which is an example that should be judged abnormal even though all points are within the control limits?
- APoints scattered randomly on both sides of the center line
- BAll points moving up and down inside the control limits
- CMany consecutive points on one side of the center line
Show answer and explanation
Answer: C. Many consecutive points on one side of the center line
Even within the control limits, patterns such as many consecutive points on one side of the center line (a run) or points rising or falling continuously (a trend) are unlikely to be chance and signal some change in the process. Using such rules allows abnormalities to be found before out-of-spec products appear.