Reliability
Regarding BTI degradation, part of the threshold voltage shift recovers once the stress is removed. What does this imply for evaluation?
- AMeasurement timing does not affect the results
- BResults depend on the time between removing stress and measuring, so measurements must be fast or conditions standardized
- CBecause it recovers, the degradation can be ignored
Show answer and explanation
Answer: B. Results depend on the time between removing stress and measuring, so measurements must be fast or conditions standardized
In BTI, stopping the stress releases some trapped charge, and the threshold voltage shift gradually recovers. A long delay between stopping stress and measuring therefore underestimates the degradation. Evaluation uses fast measurement methods and considers real circuit operation (repeated on/off switching).
- A. Because of recovery, measurement timing affects the results.
- B. Correct. Recovery makes measurement timing important.
- C. Only part recovers; degradation remains.