Business Strategy and Accounting Basics
Among the costs of a semiconductor fab, which is generally classified as a variable cost?
- ADepreciation of manufacturing equipment
- BMaterial costs such as wafers and chemicals
- CRent for the cleanroom building
Show answer and explanation
Answer: B. Material costs such as wafers and chemicals
Variable costs rise and fall in proportion to production volume or sales; typical examples are material costs for wafers, photoresist, chemicals and gases, outsourced processing costs and sales commissions. Fixed costs are incurred in a constant amount each period regardless of production volume, such as depreciation of equipment and buildings, rent and the salaries of permanent employees. A semiconductor fab requires large investment in equipment and has a high share of fixed costs, so profit tends to fall sharply when the utilization rate drops.
- A. It is recorded in a constant amount every period regardless of production volume, so it is a fixed cost.
- B. Correct. It increases in proportion to the number of wafers produced, so it is a variable cost.
- C. It is paid in a constant amount every month regardless of production volume, so it is a fixed cost.
Continue: 9 more Business Strategy and Accounting Basics questions